Location of work: Monitor Road from Midland Road to Wilder Road
Estimated Work Schedule: Pavement marking on 6/10, Guardrail and permanent sign installation on 6/11 & 6/12 if necessary. Projected to be open to traffic on June 13th.
Description of Work: Mill and resurface with guardrail, signs, and pavement marking upgrades.
Impact on Traffic: Road closed to through traffic, local traffic permitted.
- Nine Mile Road (Williams Twp) – 6/10 Shoulders
- Russell Road (Kawkawlin Twp) – 6/11 Paving
- Euclid Court, Highland Drive, Golfview Drive (Bangor Twp) – 6/11 Paving
- Mt. Vernon Subdivision (Bangor Twp) – 6/12 Paving
- Linwood Roads (Kawkawlin Twp) – 6/12 Paving
Impact on Traffic: All work will be performed in a single lane closure with traffic regulators. Additional flaggers will be utilized at intersections and high volume driveways.
A single lane closure with a lane shift will be required on M-13 for Russell Road, Euclid Ct, Highland Drive, and Golfview Drive.